4 Exclusive 3 BHK duplex homes in a single Block
Gated Community in a safe location
Close by Schools, Hospitals & Marketplaces
Approved Villas with ZERO Violation
Outdoor Utility & backyard
Covered Car Park
R.C.C Framed Structure
Structure designed in accordance with solar passive principles with ample natural ventilation and sunlight.
Anti - Termite treatment performed prior to construction
Premier solid heat resistant red brick walls
Graceful Solid Teak Wood main door
Internal doors are Solid Flush Doors with veneer finish
SS Satin finished Godrej locks & standard hardware fittings for all doors.
uPVC windows (toughened glass) for all the windows and sliding doors (Certified)
Aesthetic 2’ X 2’ Vitrified Tiles for Living, Kitchen, Dining and rooms.
Anti - Bacterial Tiles for all the bathrooms
Branded weathering course and weatherproof tiles for terrace
ISI Branded Copper Wiring with MCB controls.
Branded Modular Switches
Electrical point provision for T.V. points
Split A/C provision in all the rooms.
Kitchen top will be provided with Granite top
Stainless steel sink
Premium faucet fitting
Electrical point provision for refrigerator, washing machine
Individual Sump & Water tank with concealed pipelines
ISI Certified cPVC (Ashirvad) for hot/cold pipes
Stainless steel Taps & Wash basin for Kitchen and Dining
Jaguar - Continental fittings for all the bathrooms
All interior walls and ceilings finished with smooth Birla Putty and emulsion (Asian)
All the exterior walls finished with putty and weather shield paint (Asian)
Vels International PreSchool | 550 m |
The Indian Public School | 4.5 km |
KL Hospital | 1.5 km |
Apollo Speciality Hospital OMR | 7.5 km |
STAGE OF PAYMENT | AMOUNT |
---|---|
Booking Advance | 1 Lakh |
On Signing the agreements | 25% of the Land Cost |
On Registration | Remaining Land Cost & Stamp Duty |
On Completion of Basement | 20% on Construction cost |
On Completion of Roof / Lintel | 20% on Construction cost |
On Completion of Brick / Plastering | 20% on Construction Cost |
On Completion of Flooring / Fittings | 30% on Construction Cost |
During hand over | 10% on Construction cost/ Balance payment |
Copyright @ 2020 Dev Appartments. All Rights Reserved.